Week3

IMG_1703.JPG
Joey loves to be photographed.
IMG_1694.JPG
IMG_1695.JPG
IMG_1696.JPG
IMG_1698.JPG
8/23 It's been a month and the garage walls are up.
IMG_1699.JPG
IMG_1700.JPG
Those are major beams in the front. About 18" thick and 20' long.
IMG_1701.JPG
IMG_1702.JPG
Garage ceiling, deck floor with oversized engineered lumber.